DRAFT SOW
Published: 11/17/2017
Description
SOW_B20_Phase_2_draft.pdf Page 1 of 6 Rev 3/31/16 Statement of Work Fallon B20 Phase 2 Microwave Link 1. INTRODUCTION A no longer functioning microwave link between Building 465 at Naval Air Station (NAS) Fallon to Bombing ran...
