CGC ALDER SOW
Published: 11/21/2017
Description
ALDER_17002_Crane_Piping_Renew_SOW.docx 55600_Crane_Piping_Repair_ANK_0217_225B_216 Crane Hydraulic Tubing, Renew 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to renew eight (8) leaky 1" stainless steel suppl...
