REV_15_NOV._17_SCOPE_OF_WORK.DOC
Published: 11/27/2017
Description
Rev. 15 Nov. 2017 Two (2)-ton Bridge Crane System for Building 132 CLIN 1: Scope of Work 1. Scope: The following specification covers the furnishing and installation of a 2-ton bridge crane system. The system shall be located in the ...