BID TABULATION - BID# 2017.06 - 2017 ANNUAL PREVENTATIVE MAINTENANCE PROGRAM - SOLON, OH
Published: 11/29/2017
Description
G:\Engineering\Contracts\201706 Annual Preventative Maintenance\Bid docs\Bid Schedule Preventative.xls 6/12/2017 1 of 1 TOTAL TOTAL TOTAL TOTAL UNIT COST COST UNIT COST COST 1 ODOT ITEM 423 CRACK SEALING, HOT APPLIED TYPE IV MAXIMUM BAND WIDTH 3"...
