BID TABULATION - BID# 2017.11 - 2017 ANNUAL SEWER GROUTING PROGRAM - SOLON, OH
Published: 11/29/2017
Description
CITY OF SOLON 2017 ANNUAL SEWER GROUTING PROGRAM, CONTRACT 2017.11 BID TABULATION TOTAL TOTAL LABOR MATERIAL UNIT COST COST 1 CLEAN AND TELEVISE PIPE 8" - 15" 3,256 LF 3.80 0.10 3.90$ 12,698.40$ 2 CLEAN AND TELEVISE PIPE 18" - 2...
