CA_Q70_SUSTAINMENT_DRAFT_SOW_POSTING.DOCX
Published: 12/22/2017
Description
Statement of Work **DRAFT 12-21-17** AN/UYQ-70 Advanced Display System Sustainment 1. INTRODUCTION This Statement of Work (SOW) defines the efforts required for the manufacture, assembly, and test of the AN/UYQ-70 Advanced Display System (hereafter ...
