SOW__6WA089_DORADO_DS_ITEMS_SPEC.PDF
Published: 01/08/2018
Description
CGC DORADO DS Items The Contractor shall provide all labor and material to complete the following items per the specification provided/attached: D-001- Sewage Pipe and Tank, Chemically Flush D-003 – HVAC System Ducting, Clean D-004 – ...
