BID TABULATION - BID#18-01022 - HOT MIX ASPHALT RECONSTRUCTION, CONCRETE CURB AND GUTTER, SIDEWALK, ADA RAMPS AND STORM SEWER - MI
Published: 01/09/2018
Description
Report v1Tabulation of Bids 1/8/2018 1:18 PM AASHTOWare Project v3.01.164.01 0.34 mi of hot mix asphalt reconstruction, concrete curb and gutter, sidewalk, ADA ramps and storm sewer on East Oliver Street from Oak Street to Gould Street in the city...
