VA259-17-R-1086 00009 RFI #4.PDF
Published: 01/09/2018
Description
RFI #4 1. At areas where the construction will breach corridor walls as shown on sheet AD-101, will the barriers be permitted to be “Edge Guard” style panels via ILSM or will they need to be of 1HR construction. a. At areas where the construct...