CONTRACTOR'S QUESTIONS ANSWERED
Published: 01/09/2018
Description
Q&A_1-9-18.pdf WA PRA OLYM 12(2) Hurricane Ridge Road, Phase II # General Technical Question Answer Date 1 X The Bid Schedule lists Lining for 18” and 24” culvert pipe. The drawings call for lining 36” and 48” culvert pipe as well but these a...
