36C24518B0027 00003 RFI NO 1 (REVISED 1-24-18).PDF
Published: 01/25/2018
Description
January 24, 2018 RFI Responses: 1. Please confirm that the contractor is to provide an additional addressable FACP, which will be "interfaced" with an existing FACP in Building 305 (per Sec. 2.3, Pgh A, Subpara 1). Existing FACP located in c...