FA301018R0020.PDF
Published: 04/05/2018
Description
F2J31D8066AW03 MAHG18-1006 Repair Water Tow er #3 IAW attached Specif ications and Draw ings. The magnitude of proposed construction is betw een $500,000.00. and $1,000,000.00. This acquisition is being issued as a HUBZone set-aside. Enter price ...
