ATTACHMENT 1_01300_SUBMITTALS.DOC
Published: 02/12/2010
Description
PART 1 - GENERAL 1.01 SCOPE: A. Perform all work necessary and required for the construction of the project as indicated. Such work includes but is not limited to the following: 1. Shop Drawings 2. Samples 3. Catalog Data 1.02 SUBMITTALS A. Submittal...
